Some projects concerning provincial and district public transport networks were drafted when drawing up the Transport Plans and Plans for Provincial Mobility:
A project for the rationalization and optimization of public transport activities carried out at the Autodelo Company in St. Petersburg,1993
A study for the renovation of the Asti public transport system
A study for the renovation of the Settimo T.se (TO) public transport system
A project for public transport in the provinces of Biella and Vercelli
In order to provide simulations, alternative scenarios of road system layouts were prepared when drawing up some of the Urban Traffic Plans and Provincial Transport and Mobility Plans.
Feasibility studies relative to the preliminary project of the alternative (piedmont)State Road 142, for Biella Province; alternative scenarios simulating traffic flow ,1999
Feasibility studies relative to the modernization of State Road 231, Cuneo- Fossano and Fossano- Roreto di Cherasco tracts, for the city of Fossano (CN); alternative scenarios simulating traffic flow ,1999
Alternative scenarios simulating traffic flow for the Urban Traffic Plan of Correggio (RE),1998
Alternative scenarios simulating traffic flow as part of the Territorial Coordinating Plan of Torino Province,1998
Alternative scenarios simulating traffic flow for the Mobility Plan of Biella Province,1997
Updating predictions and analyses of traffic on the A6/A21 highway link, to evaluate the environmental impact,1997
Alternative scenarios simulating traffic flow as part of the Territorial Coordinating Plan of Rubicone,1996
Organization, execution and elaboration of traffic and mobility studies: origin/destination motivational studies regarding people and merchandise; telephone surveys concerning family mobility; studies carried out at companies regarding merchandise mobility; investigations of tourist mobility carried out at accommodation facilities; traffic surveys and travelling time; examination of parking supply and demand. The Company conducted the studies and surveys as part of the various Urban Traffic Plans, and Plans for Mobility and Transport.
Survey of private traffic in Torino,1999
Traffic and parking studies for the city of Saint Vincent (AO),1999
Organization and elaboration of studies concerning public transport- Biella Province,1998
Organization and elaboration of motivational research for the city of Chieri (TO),1997
Organization and elaboration of origin/destination studies and traffic flow for the Mobility Plan- Biella Province,1996
Examination of public transport and mobility- Province of Torino,1992
Survey of private traffic in Torino,1992
Characteristics of user mobility for passengers leaving Torino- Caselle Airport,1991
Characteristics of user mobility for passengers leaving Aosta Airport,1991
Survey of private traffic and travelling time along certain routes in Torino,1991
Origin/destination studies in the city of Arona (NO),1989
Traffic survey in Borgosesia (VC),1989
Examination of traffic for the study of roads and circulation for the commercial appeal of the Rinascente- Venaria Reale
Origin/destination and traffic volume surveys for the analysis of crossroads in the city of Fossano (CN)
As part of the Urban Traffic Plans and Provincial Mobility Plans carried out by the Company, preliminary projects were drawn up for intersections, smooth flow of traffic and road reorganization.
Assistance with the preliminary planning of a model for a pedestrian bridge to be placed along the jubilee itineraries in Rome,1998
Methodological study of cloverleaf junctions for merchandise in Torino Province,1993
Study for the Urban Parking Plan in Arona (NO),1990
Study and analysis of accessibility to the shopping center in Rivoli (TO),1988
Study for optimal localization of a dump for solid urban waste in the high Susa Valley
Contributing ideas for the realization of a transport system at Orvieto (with a team)
Preliminary study and sizing of a ski resort at Ponte Maira- town of Acceglio
Aerial cable for concrete transport at Fornolosa-town of Locana
Study for the strengthening of ski lifts at Frabosa Soprana (CN)
Analysis of technical-economic feasibility for the modernization of the Cuneo-Airasca railway line and of the railway system in northeastern Piedmont (with a team)
Preliminary project for sport-recreational equipment to be added to the Stresa Alpino-Mottarone cableway
Cost-and-benefit analysis for the alteration of State Road 231 at Fossano (CN)
Development prospects for the ski area of Val Troncea-Pragelato
Preliminary project for the cloverleaf junctions and technical-functional feasibility for Line 2 of Torino's rapid surface transit system
Report on the environmental impact of a supporting infrastructure for merchandise traffic at San Didero (TO)
Study for the strengthening of the Casale-Cuneo railway line (with a team)
Study of possible functional developments of the Domo 2 railway station
Study of roadways and circulation adjacent to Città Mercato in Venaria Reale, and relative projects
Study of city roadways in Novi Ligure (AL)
Projects relative to traffic census and to the examination of road reclassification in the regional territory
Analytical inspection of the principle techniques of merchandise handling and warehousing (with a team)
Evaluation of the effects on roadways in the district of Torino due to the opening of the Orbassano multi-modal center (with a team)
Study of company reorganization for the Asti Garbage Collecting and Transport Company